Geothermal

NewsUncategorized

Regional News from the July/August 2015 Digital Edition of Renewable Energy World

EcoFasten Solar announced that it launched a new mounting “Rock-It System” that it would be displaying during Intersolar. Product compliance was determined through testing per UL Subject 2703, which reviews integrated grounding and bonding, fire classification and mechanical loading.

EcoFasten Solar’s solar roof mounts and components are designed, engineered and manufacturered in Morrisville, VT. Working closely with leading solar developers, racking system providers, roofing manufacturers and commercial installation companies, the company said that its products are fast and easy to install and “were designed with the installer in mind.”

Read More
Uncategorized

SkyPower Inks $2.2 Billion Deal for Massive Solar Power Plant in Kenya

Kenya’s Energy Ministry and SkyPower Global Ltd. will sign a $2.2 billion agreement on Sunday that paves the way for the Canadian company to develop a 1-gigawatt solar project in East Africa’s biggest economy.

The solar project will be developed over five years, SkyPower said Friday in a statement. Kenya currently gets about two-thirds of its electricity from renewable sources, chiefly hydropower stations and geothermal wells. It has no solar developments of that scale.

Read More
Uncategorized

SkyPower Inks $2.2 Billion Deal for Massive Solar Power Plant in Kenya

Kenya’s Energy Ministry and SkyPower Global Ltd. will sign a $2.2 billion agreement on Sunday that paves the way for the Canadian company to develop a 1-gigawatt solar project in East Africa’s biggest economy.

The solar project will be developed over five years, SkyPower said Friday in a statement. Kenya currently gets about two-thirds of its electricity from renewable sources, chiefly hydropower stations and geothermal wells. It has no solar developments of that scale.

Read More
Uncategorized

How Solar Energy Zones and Easy Permitting Helped Create 3-cent Solar

Warren Buffet’s utility NV Energy has signed the lowest price contract for solar ever, at just US $0.0384 for First Solar’s 100-MW Playa Solar project, beating even its own record low price of $0.046 cents for SunPower’s 100-MW project in Boulder City, Nevada.

Both solar projects benefit from new streamlined permitting set up through the Bureau of Land Management’s (BLM) Western Solar Plan, which designated 19 Solar Energy Zones (SEZ). This auction covered six parcels across 3,083 acres in Nevada. The previous case-by-case way to permit solar on BLM land was taking at least two years; and even longer if anything to tripped up the process. 

Read More